Saturday, 4 July 2020

Famous For Visitors Since 1066 (2)

Today is fbb's 3,500th published blog.

The specially built narrow width Hastings diesel electric units appeared in blue and grey livery ...
... and some of the six-car sets had a buffet.
They was very posh and shiny ...
... and had the first ever BR powered doors through to the next carriage.
The buffet cars were later removed.

There are also narrow class 33 diesels to handle freight trains.
But in an impassioned desire to get rid of stock which contained asbestos and in response to the growing cost of maintaining a small dedicated fleet of non-standard passenger trains, BR took the decision to electrify the Hastings line with the aim of using the standard British Railways electric trains of the day.

To paraphrase Scooby Doo, they'd have gotten away with it easily if it hadn't been for those pesky kids tunnels!

Various engineering solutions were adopted to overcome the problem. Tunnels were single-tracked, speed limits were applied to stop the trains swaying into the side and one tunnel had lower-height slab track installed. In the end the route was passed as C1 loading gauge, i.e. normal.

Enter the Jaffa cakes!
Dark on the top, light on the bottom and with a strip of orange through the middle; thus the trains for the Hastings line got their nickname.
For a while they even carried a special brand name ...
... despite the growing proliferation of the Network SouthEast paint job! The timetable was improved and there were special fares offers.
But this move pushed this line into railway normality, continued with the arrival of the Networkers.

Will the "old" SouthWest Trains Windsor lines class 707 stock begin to appear on the Hastings run ...
... now that First's South Western Railway has decided to throw them away?

And so, we return to those withdrawn narrow-bodied buffet cars.

What I need, pronounced the general manager of the southern region, is a nice inspection saloon; so that I can tour my realm and, well, inspect it. It would be a jackpot idea to turn one of those surplus buffets into a posh single car manager's state coach.

And so they did.
And you could, originally, drive whatever was pushing it, as a cab was installed at the front end.
It/She/He (possibly not "he") was named Caroline.

Hence "Sweet Caroline", hence Neil Diamond. His song doesn't really offer itself as a possible parody although the chorus is nice.
The saloon has had various owners since the demise of British Railways - but now comes the news from Revolution Trains that it is going to make a model of Sweet Caroline.
And if you, as Fred Pontin was wont to say, "Book Early" you can have one for the bargain price of only £135. (only??????). Full price will be £149.

If you are one of the first to buy, you will be entered in a prize draw to be a passenger in Caroline for a spiffing rail tour ...
... with refreshments, as yet unspecified.

That price is for an unpowered coach, and it is the same price as a typical powered locomotive!

Or you could buy a MARC Models metal kit for £75 ...
... adding sweet little plastic chairs and tables.
OR you could buy one assembled and painted ...
... for £275.

fbb will not be investing in his own model for the MD of the Peterville Quarry Railway. He (the OO scale manager, that is) can take a ride in Henrietta propelled at a gentle pace by Toby the Tram Engine.
In any case, the manager has a bigger nut to crack.

The Three-Way Dilemma
Long term blog readers may remember that fbb installed a three-way point at the throat to Peterville Quarry station, replacing a normal turnout.
Such devices are used on model railways, as on the big railway ...
... to save space and squeeze in an extra siding.
fbb's point was installed four years ago; but two years later it had failed. Look closely and you will see as little wire almost hidden between two small chunks of moulded plastic, there in the middle between the point blades.
That is an "over-centre" spring which keeps the moving point blades tight against the fixed stock rails.

The spring for the left hand turn had dissolved away completely whilst that for the right hand turn was still strong and working well.

Assuming that it was he who had "done something wrong" fbb replaced the three-way-point, spending another £30.

Then two years later, i.e. last Wednesday, the old man was attempting to clean track and he saw that the replacement point had broken in exactly the same way, i.e. the left turn over-centre spring had rotted but that for the right turn was good and functioning well.

Co-incidence or design fault?

Both sets of points have gone off the Peco at Beer for their comments. Probably they will tactfully tell fbb that three-way points are too delicate to be used outside. That would be understandable if  BOTH over-centre springs had rotted - but only one, and the same one on each set?

But fbb has something else to challenge his ever inventive mind ...
Is Peterville about to get an airfield?

You will have to wait and see.

 Next Weekend Variety blog : Sunday 5th July 

Friday, 3 July 2020

Famous For Visitors Since 1066 (1)

Battle of Hastings?
Not really.
Battle of Battle?
Battle Abbey was built some years AFTER the battle as a penance for the many lives lost. The community that grew up around the abbey became known as "Battle" but well after the battle was embattled.

Battle of Senlac Hill?
The name was popularised by a Victorian historian but with only tenuous links to more ancient documents.

But surely Harold was definitely shot in the eye with an arrow?
The Bayeux Tapestry provides even shakier evidence for that because it is possible that the arrow's feathers were added by an over-enthusiastic restorer.
So maybe chummy was simply holding a spear.

In any case maybe the next glyph of the tapestry is Harold being "cut down" ...
... (interfectus est); so maybe he was Harold and the dubious arrow recipient/spear thrower  wasn't!

What we can be sure of, however, is that Hastings' popularity as a resort grew rapidly once the railway from London opened.
The railway was constructed by the South Eastern Railway in the early 1850s across the difficult terrain of the High Weald. Supervision of the building of the line was lax, enabling contractors to skimp on the lining of the tunnels.

These deficiencies showed up after the railway had opened. Rectifications led to a restricted loading gauge along the line, requiring the use of dedicated rolling stock.
Although the contractors had charged for six rings of bricks, they had only used four. Due to the cost of reboring the tunnels, this had to be rectified by the addition of a further two rings of brickwork, reducing the width of the tunnels by 18 inches. The result of this was that the loading gauge on the line was restricted, and special rolling stock had to be built.

Note the very flat and narrow shape of the carriages in the picture of a train at Wadhurst.
Then in 1957/8 steam was replaced by diesel electric units which, likewise, were built with narrow dimensions.
Preservationists Hastings Diesels Limited has superbly re-created the colour and the shininess of the carriages as delivered. Here is a gorgeous motor carriage (No S60000) as preserved.
We will continue with the story of the Hastings line in tomorrow's blog; so look forward to some Jaffa Cakes and a song from Neil Diamond.

But now, the long awaited item from Wales ...

Porthmadog For Breakfast
Northampton Alan is quite keen on the Festiniog and Welsh Highland Railways and visits often. He brings some good news for others who may wish to enjoy these magnificent narrow gauge lines.

Firstly, a snippet of geography. Porthmadog is on the west bank of the Glaslyn estuary linked to the east bank by a causeway, known as the Cob. 
The terminus is lower left ...
... with platforms extended onto the Cob.
These were built to accommodate the longer trains running through from Caernarfon on the Welsh Highland Railway. It must be fun to meet one of these as it trundles along the main road outside the station!
The large block on the opposite side of the road from the railway ...
... looks a bit like a hotel - only it isn't.
It is, or more correctly was, a tax office. But the council has approved its demolition to be replaced by ...
... you guessed it, a hotel - a Premier Inn no less; but with a splendid view of goings on at the station.  And, yes, that is a routemaster bus in the distance.
Alan, a great Premier Inn aficionado, is thrilled because for years he has had to slum it in the Travelodge at the other end of town.
Alas, the Travelodge has no caff, but Alan recommends a nearby establishment, literally 3 minutes away and on a mini industrial estate.
It offers take away or eat in ...
... and Alan kindly sends a menu. The Hercules Breakfast ...
... looks like a nice snack to start a busy day watching and riding on gorgeous narrow gauge trains.
It would certainly keep you going till lunchtime - and much better value than anything a future Premier Inn can offer.

fbb might well stick to the Travelodge!

The breakfast would certainly set him up for a Welsh Highland line run to Caernarfon and back.

And Especially For A Complaining Anonymous

Comment the first ...

I doubt if Anonymous has any knowledge of TSY operations at first hand. The situation on the ground can be far WORSE than you depict. 

Comment the second ...

Tram on-board announcements:-
It is confirmed that after leaving Spring Lane we get a general announcement that this tram terminates Birley Lane (it doesn't go that far - it terminates at Gleadless) change Manor Top for forward connections.

Approaching Gleadless ; tram terminates, change here for - SILENCE. Then, after a pause ...

There are no replacement buses. (as seen below)

Comment the Third ...

218 Stand at Sheffield Interchange.
For this week's prize, spot the departure list of times for the service to Bakewell.
The PTE/TSY expects you to guess.

Beyond belief - yet again.

 Next Famous For Visitors blog : Friday 4th July