Stagecoach Stockport Switch Suspended
But there is still no explanation of the "problem" at Stockport depot.

A collection of posts which expose failings (and, occasionally, successes!) in our public transport system; most of which could be easily solved or improved. There's plenty of nostalgia, too; and a bit of transport history from time to time.
Daily blogging is "the norm" and will continue until fbb runs out of ideas!
Stagecoach Stockport Switch Suspended

Good News For the North East
The Newton Aycliffe facility was created as a result of the Agility Trains consortium being selected to produce high speed trains for the Intercity Express Programme in 2009. During 2011, Hitachi announced its selection of the site and construction work commenced two years later. The 43,000 m2 (460,000 sq ft) factory, which was officially opened on 3 September 2015, was completed at a cost of £82 million. Initially, the facility only performed assembly, using components that were produced elsewhere to complete trains, and no actual manufacturing operations took place. However, some manufacturing activities have been performed at Newton Aycliffe for later-built trains.
The factory is notable as the source of the 800 series of trains.
Bad News For Derby?
With the end of production of the Aventras of assorted hues, there is no work for the lads and lasses of Litchurch Lane.
Illustrated above are the Aventras now trundling up and down the Elizabeth Line line in London.
Presumably the original contract for the main fleet included some complex add-on deal which has now been switched on.
Huge sighs of relief.
The North East Awaits
The Labour Party might not want to risk losing votes once again from its "red wall" heartland; so expect the bunnies to start gamboling all over Newton Aycliffe in the very near future.
Meanwhile, many pensioners will be shivering this winer.
Next Variety blog : Saturday 7th Sept
Particular Problem with Parking