Understandable Misunderstanding!
A few days back, fbb criticised Rail Future for illustrating an article about "extra" seats for EMR by showing a Grand Central Class 222.Thanks to correspondent Michael, fbb can correct his negative assumption- perhaps.
Here is the gist.
East Midlands Railway (EMR) is to introduce up to 17,000 additional seats a week on its Intercity services as delays to the rollout of its new £400m Aurora fleet continue.
The train operator, which is run by Transport UK, will introduce two Class 221 trains leased from Grand Central from Monday, December 14, providing ten-carriage services on selected weekday routes between Sheffield, Nottingham and London St Pancras. The move is a temporary measure designed to increase capacity while EMR continues t...
You can carry on reading TheBusinessDesk.com for free, but you have reached the maximum number of pages an unregistered user can view. To register for an account, click here or login below...
fbb didn't; but is still confused. (Easily done, these days!)
Surely theose 222s are merely temporary replacements for the two units badly damaged in the recent tragic "coming together".
Rebuilt is the right word because the damage to the "tube" that forms the main structure of a modern integral carriage is likely to be far reaching.
In the olden days, a welding torch for the chassis and some new timbers for the body would be the simple basis of a repair. Now we need clever (and expensive!) structural engineering.
Thank you, Michael, for the information.
National Express : Spent In Kent!
Route 002 runs for Victoria to Dover ...
... and route 022 to Ramsgate.These route serve multiple stops as here with 007 ...... and 022.But it will have a train every hour at 09 or 10 mins past with a hiccup or two late evening and early morning.
fbb's Gastronomy Guide




















































