Tuesday, 27 April 2021

Hardship At Hammersmith (2 - Rebuild)

 On A Par With Brunel?

Joseph (later Sir) Bazalgette (g as in "gendarme" not g as in "get") was of French descendancy, hence his name's pronunciation, and rose to the dizzy height of Chief Engineer to the Metropolitan Board of Works. Born in 1819, died in 1891, he was a prolific worker; most famous for his new sewer system for London, which made a massive contribution to Public Health. His memorial lies, not just in the "down below" bur in the very visible stuff he designed or managed.
He was busy and prolific in other ways ...
... although fbb suspects that Mrs Bazalgette contributed much of the hard work!

His clever plan for Hammersmith was to build a new bridge, but to plonk it on the stone piers of the original. His designs for the superstructure were significantly more florid than those of Tierney Clark.
Typical of his lavishness was his design for embellishment of the smaller anchoring towers at both ends of the structure. The statuary is ornate enough ...
... but Joe wanted a classic coat of arms. He was not satisfied with one heraldic embellishment ...
... he had seven. At one time they were painted in their authentic heraldic colours ...
... but Hammersmith and Fulham Council has seen fit to economise with base green and a few dabs of gold. Pity!

In the centre is the UK Royal Insignia, the clockwise from centre left we see ...

City of London (with cross)
Kent
Guildford
City of Westminster (portcullis)
Colchester - and
Middlesex

... all surrounded by the very English Acorns and Oak leaves.

The bridge has been through the wars since the war, as summarised by the timeline below.

1939 : IRA attempts to blow up the bridge.- FAILED

1973 : Refurbished

1984 : Barnes-side tower bearings failed

1987 : Further remedial work

1996 : Provisional IRA attempted to blow up the bridge - FAILED

1997 : CLOSED except buses, cycles and pedestrians

1998 : Re-opened with 7.5 ton weight limit.

2000 : Damaged by a Real IRA bomb - CLOSED FOR 2 YEARS

2014 : Closed for further repairs

2016 : Further work delayed by wrangle over who pays!

Which brings us to the situation that developed from 2019.

Continued in tomorrow's blog.

History Made At Kings Cross
fbb remembers a discussion with his future brother-in-law (John), way back in the late 1960s, when signal boxes featured. Bro-in-law said that he had read an article which suggested that British Railways (of fond memory?) had a cunning plan to serve the whole of mainland Britain's rail network with just FIVE mega signal boxes.

John could not remember where he had read it and fbb doubted the veracity of the report. Even in 2021, there are still a good few "real" signal boxes in operation, usually on secondary lines and thus contributing to the poor financial performance of said routes.

But along came "Power Boxes" with those at Euston, Bletchley and Rugby controlling the main line whilst the Northampton loop retained men, levers and wires. Power Boxes have now morphed into signalling centres with wider and wider areas of coverage.

Last week the Power Box at Kings cross ...
... was switched out at 2359 on 24th ...
... leaving the obligatory coffee cup to languish into obscurity. Busy computer screens ...
... went dark ...
... and the last train to be signalled by the man ...
... set off northwards.
From the witching hour ...
... the signalling centre at York was in charge.
There's no window for the signalman to lean out, give the train driver a cheery wave and be acknowledged with a toot of the horn.

Sad, but the inevitable computer screen is now king - big screens admittedly!
And no coffee mug in sight!

A later plan from Notwork Rail is slightly less draconian than just FIVE signal boxes; ELEVEN will be needed say the boffins, but recent schemes to move more areas into mega signalling centres seem toi have been dropped. Maybe big is not as beautiful as the bosses once thought?

And there's more.

Also at Kings Cross, THIS has happened.
The refurbished eastern bore of the tunnels immediately north of Kings Cross Station is now finished and available for use. The opening was celebrated by parading a Thameslink and an LNER train running into the platforms. 

The tunnel was taken out of use about 40 years ago as part of a "track rationalisation" and is now needed to increase the capacity of the station and its approached. Presumably it is now irrationalised?
Proper job!

It is good to see that, in this electronic age, there is still a need to label the tracks "A" and "B" in case the train driver gets lost! It is not always all on line!

48 Bars : Could Have Been 168
Has fbb taken to drink?  Thankfully, no!
Those of our readers who are old enough to remember the Triang platform canopy may also remember that its glazing consisted of a flimsy sheet of plastic with frames printed on in yellow.
fbb has learned his lesson, namely that thin plastic goes brittle if left outside and is insufficiently robust to resist the impact of scale medicine balls flung at it at great speed. Raindrops cannot be reduced to 4mm scale!!

So yesterday fbb spent a whole morning adding glazing bars, but two per opening not the original Triang 7, 48 vice 168.
fbb will not be subjecting his readers to progress with painting as reading about paint becoming dry is almost as tedious as watching it. But when the livery is finished, fbb will have to attend to the glazing and fitting the lights.

 Next Hammersmith (plus) blog : Wednesday 28th April 

Monday, 26 April 2021

Hardship At Hammersmith (1 - History)

 William Tierney Clark

The small community of Hammersmith was situated on the peak of a huge bulge in the River Thames with houses along the main London road (A4 to be) and dotted along the river bank. Note the small community of Brook Green (upper right), Brandenburgh House (near the R of "River", centre) and Barn(es) Elms (lower left).

Brandenburgh House ...
... was once the residence of the unwanted Queen Caroline and demolished sometime after 1822. There is a modern development of apartments on part of the site, also named Brandenburgh House. Pre apartments-ville the area had become industrial with a sugar factory and brewery.

Barn Elms (also gone) ...
... was, at one time, owned by Queen Elizabeth I and was gifted to one of her favourites, Lord Walsingham. It later became the Ranelagh Club and is now replaced by housing with the name preserved in the modern use of just a small part of its extensive estates.
But, as Hammersmith grew, there was a demand for a bridge across the river - it was a long way round to Putney Bridge (east) or Chelsea Bridge (west). 

So the worthy burghers of Hammersmith turned to William Tierney Clark.
A  company was duly formed and in 1827 a magnificent chain suspension was opened.
It was very much the wonder of the age and began life as a toll bridge.
A new approach road was constructed at Hammersmith and the bridge company was obliged to purchase most of the Barn Elms estate where two new roads were built. Initially named Upper Bridge Road and (with great originality) Lower Bridge Road ...
... these were later renamed as Castlenau and Lonsdale Road respectively.
Later the Bridge  company was able to sell off land between the two new roads for housing development.

The new Hammersmith Bridge was very popular particularly on Boat Race days when crowds would use it as a grandstand.
Reports on the day said that the bridge swayed violently as the crowd rushed from one side to the other "pooh sticks style". Yikes!

Tierney Clark went on to build a smaller chain bridge at Marlow (1832) ...
... and in 1840 a larger version in Budapest - the first bridge to link Buda with Pest.
The good bridge builder has a plaque in St Johns Church Hammersmith commemorating his local chef d'oeuvre!
But after a modest 60 years, it was clear that Hammersmith Bridge was not big enough or strong enough for increasing traffic and a rebuild would be necessary. And this was the man to do the job.
More tomorrow.

Bodge Number 5
fbb cut one of his legs a little short - not self amputation (!) - but part of the ongoing platform canopy project. Sensibly, he should have created another leg, but that would have been dispiriting. So ...
... a small plidget of plastic rod filled the gap under the right leg. It will be hidden by a milk churn or a pile of luggage, both popular preservation platform pieces beloved of Heritage Railways.

Routemaster Route Removed
Coach and Bus Week, a trade magazine for coach and bus buyers that is published weekly - clever name, eh? - reports:-

His Mayorship Is Embarrassed!
Tim Dunn (he of recent railway architecture programmes) has spotted this little beauty. It is, obviously, an artist's impression of a new Piccadilly Line train going all the way to Cockfosters.
But London Mayor Mr Khan is a bit squeamish about the name of the Piccadilly terminus. To avoid public sniggering, his various PR outputs for the train has replaced the supposedly smutty name with ...
... Arnos Grove!

It is a good thing Mr Khan is not developing a project a mile of so from fbb's former family home. This is ...
... Northampton's Lumbertubs pub at Buttocks Booth.

A Sheffield Thought
Buses have been banned from Leopold Street and Pinstone Street to "improve the environment". It has also made life more difficult for thousands of Sheffield residents who find it more difficult to get where they want to go.

Buses are banned ...
... but access has to be kept open so that motorists can drive their polluting vehicles  to car parks along roads where buses are banned, to the detriment of Sheffield's population.

Logical, eh?

Blast Form The Past (c/o Twitter)
What is a Network SouthEast logo doing on unit 365522? It certainly is NOT a train in NSE Livery ...
... and other pictures of the unit do not show the logo.
Is Chris Green (erstwhile boss of NSE) snooping around sticking stickers on what were once HIS trains?

 Next Hammersmith blog : Tuesday 27th April 

Sunday, 25 April 2021

Sunday Variety

 CHURCH LINK

SERVICE STARTS AT 1030

Today's service is live and ON-LINE
back in the Church.
 Click on this link (here),
which will take you to the YouTube page.
Then click on the icon for today's date.

-o-o-o-o-o-o-o-o-o-o-o-o-o-o-o 

Coastliner Changes

fbb is indebted to correspondent Colin for digging out the new much improved timetable for Transdev Coastliner's remarkable half hourly service all the way from Leeds to Scarborough. In recent years many of the traditional long distance services have been split or significantly modified so it is truly revolutionary to run every 30 minutes with a three hour end to end journey time.

The Whitby spur of the Coastliner network has also changed. There are more buses all the way to Whitby, BUT ...
... most journeys now shuttle (if you can call a 95 minutes journey a "shuttle"?) from Malton with the occasional 840 from York. The route is indeed magnificent, but fbb does wonder whether the lack of through trips from York may deprive the service of some of its tourist traffic.

But there are undoubtedly significant extra resources being used here and, following the dreaded virus slow-down, this must be considered a "courageous" development.

A Scary Headline?
Panic not, rail enthusiasts; Bedminster does not become Bristol South Parkway. It's engineering work, innit?
Apparently the EAST end of Bristol Temple Meads will be dug up so nothing can get through. In the initial reports, fbb cannot glean why this means nothing can creep surreptitiously into the WEST of Temple Meads. 

Long distance GWR trains to London mostly turn tight north of Taunton but it will be interesting to see what CrossCountry trains will do.

Bedminster is not the most salubrious of stations. Direction signs are not very encouraging ...
... and these lead to the only highly uninviting entrance via creepy subway.
The station is unstaffed and replete with welcoming facilities, namely an enquiry point or two and a couple of bus shelters.
It once had four platforms, but only three are now in use. The other problem with using it as a temporary terminus for Temple Meads is that the platforms have long since been shortened for local DMU services only. This has been achieved by the simple process of allowing long bits of ex platform to fall into decay.
You can see the fenced-off dead bits in the distance in the above shot and helpfully enlarged below by fbb.
So, currently, the lads from Notwork rail are busy bringing the closed off bits up to an acceptable standard for the used of those inconvenient creatures, namely the passengers.

Windmill Hill is closed to traffic leading TO the luxurious station entrance ...
... and all the roads on the far side of that bridge are very thin and one-way. Presumably the buses will lurk on Whitehouse Lane (see map below).
It sure will be fun, fun, fun all the way for those travelling via Bristol when this lot kicks off.

The Wheel On The Bus Came Off!
Sheffield chum David has updated fbb on the Thandi Flixbus "problem".

What Is It?
It is a First Kernow double decker, obviously!

But Kerdroya?
Does the small print help?
Erm, no!

But, as ever, the sainted interwebnet helps out. Kerdroya is one of these ...
... and here is an ebullient Cornishman who will explain all.
The single-path (unicursal) seven-course "Classical" design without branching or dead ends became associated with the Labyrinth on coins as early as 430 BC, and similar non-branching patterns became widely used as visual representations of the Labyrinth – even though both logic and literary descriptions make it clear that the Minotaur was trapped in a complex branching maze. Even as the designs became more elaborate, visual depictions of the mythological Labyrinth from Roman times until the Renaissance are almost invariably unicursal.

So a Labyrinth is a maze that is not particularly amazing, just a simple curved walk into the centre and out again with no puzzles. Nobody seems to know what their purpose was; opinions range from a circuitous walk to an altar of sacrifice to a vanity project by a wealthy Greek or Cretan!

Colliford Lake is off the A30 on Bodmin Moor ...
... and currently is not served by First Kernow Bus (note Bodmin, bottom left).
Are we to expect an extension of route 27, or yet another Kernow tourist route from the start of their summer timetable in May?

The excitement of anticipation is almost too much.

And Zip Between Doncaster And Barnsley!
The X20 was one of a group of Express bus services (slightly less slow bus services) developed by Yorkshire Traction when it was Yorkshire Traction.
It continued after Stagecoach took over.
It is not "direct" but starts from Doncaster then runs along the main road towards Rotherham and Sheffielld ...
... before veering sort of north westerly via Conisbrough (only two letters "o" not three) and the Dearne Vaslley ...
... before reaching Barnsley via Hoyland.

It is now run under South Yorkshire PTE tender by Powells ...
... who have announced its 67 minute Zippiness. For through journeys between the two towns Stagecoach's X19 is quicker ...
... at a bearable 45 minutes. For a while, Stagecoach had branded buses. Showing true originality, they were branded ...
... X19. Clever name, eh?

More Detail On The Canopy
Little beams on the sloping extensions to the Triang originals; and cross bracing on the legs. Much filling and filing needed to tidy things up. Then it is paint brush at the ready. 

What would be the best colours? Such are the anguishes of a railway modeller bodger.

 Will It Be The Hammersmith blog? Monday 26th April